期刊文献+

跨铁路宁波东站桥梁顶推施工的导梁设计 被引量:14

Design on launching nose for incremental launching bridge construction across Ningbo East Station
下载PDF
导出
摘要 在桥梁顶推中,导梁起到减小主梁内力和增大顶推跨度的作用,导梁配置对整个顶推施工有着重要的意义.针对跨铁路宁波东站的顶推施工介绍了一种导梁设计方法,通过建立导梁的力学模型,采用计算机软件进行集成结构分析,求解出导梁和钢箱梁最大的应力及变形,确定其是否满足结构受力要求.同时针对钢箱梁与导梁连接时不能平稳滑过临时墩的问题采用了在导梁底部"挂拆"板的方法,为顶推施工中导梁的设计方法提供了一定的参考. During the bridge incremental launching, the launching nose allocation secures a crucial position in reducing girder internal force and increasing the incremental launching span. Pertaining to the incremental launching bridge construction across Ningbo East Station, a launching nose design method is proposed. By establishing the mechanical model on launching nose, the integrated structural analysis is conducted via computer simulation. Accordingly, the maximum stress and deformation of the guide beam and the steel box girder are solved to satisfy the structural loading requirements. Meanwhile, due that the steel box girder and launching nose cannot be stably guided through the temporary pier,a hanger plate in launching nose bottom is adopted. Therein, this approach provides a reference to launching nose design during incremental launching.
出处 《中国工程机械学报》 2013年第1期70-74,共5页 Chinese Journal of Construction Machinery
关键词 桥梁施工 顶推技术 导梁 力学模型 计算机仿真 bridge construction incremental launching technology launching nose mechanical model computer simulation
  • 相关文献

参考文献7

二级参考文献27

共引文献85

同被引文献69

引证文献14

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部