装配式预应力混凝土箱梁预制施工常见问题及解决方法 被引量:3

Common Problems and Counter measures for Prefabricated Prestressed Concrete Box Beams During Construction
下载PDF
导出
摘要 在装配式预应力混凝土连续梁预制的实践中,通过不断探索,提出了一系列相应技术措施,较好地解决了预制梁施工中常见的一些问题,保证了工程质量,方便了现场施工,提高了劳动效率。总结了该类型箱梁预制施工的基本经验,为后续箱梁预制施工提供借鉴。 In the practice of prefabrication of prefabricated prestressed concrete continuous beams, and through a long - term exploration, a series of relevant technical measures are presented, well solving some common problems occurring on the construction of prefabricated beams, guaranteeing the project quality, making convenience for site construction, and increasing labor efficiency. Basic experience from the construction of this sort of box beams is summarized, providing references for further prefabrication construction of box beams.
作者 舒冬林
出处 《北方交通》 2013年第2期62-65,共4页 Northern Communications
关键词 装配式预应力混凝土箱梁 箱梁预制 混凝土工程 Prefabricated prestressed concrete box beam Prefabrication of box beam Concrete project
  • 相关文献

同被引文献8

引证文献3

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部