溧阳抽水蓄能电站上水库面板堆石坝设计及优化 被引量:5

Design and Optimization for the Concrete Face Rockfill Dam of Upper Reservoir in Liyang Pumped-storage Power Station
下载PDF
导出
摘要 溧阳抽水蓄能电站上水库面板堆石坝坝基地形条件和料源复杂,大坝不均匀变形问题突出。在遵循常规高面板堆石坝设计思路的基础上,重点解决面板堆石坝和上水库回填库底的变形控制,以及大坝的渗流控制、环境保护及景观协调等问题,最终选定了合适的面板堆石坝结构体形、坝体材料分区和坝料填筑参数等,为大坝安全、稳定运行奠定了基础。 Because of the complex terrain conditions in dam foundation and different sources of dam filling material, the inhomogeneous deformation of dam in upper reservoir of Liyang Pumped-storage Power Station will be serious. Based on the design ideas of conventional high CFRDs, the design of CFRD in Liyang project mainly solves the deformation control of CFRD and upper reservoir's bottom backfill, and the seepage control, environment protection and landscape coordination of dam. The final CFRD's structure and shape, material zoning and material filling parameters which suitable to this project are selected, that provide a guarantee to the safe and stable operation of dam.
出处 《水力发电》 北大核心 2013年第3期32-34,37,共4页 Water Power
关键词 混凝土面板堆石坝 设计 优化 溧阳抽水蓄能电站 concrete face rockfill dam design optimization Liyang Pumped-storage Power Station
  • 相关文献

参考文献6

  • 1杨泽艳,罗光其,罗洪波.洪家渡混凝土面板堆石坝设计[J].水力发电,2001,27(9):14-16. 被引量:4
  • 2林诚魁,姚秀梅,陈敏岩,卓文仁.芹山水电站混凝土面板堆石坝设计[J].水力发电,2000,26(2):14-16. 被引量:2
  • 3侯靖,徐建军,等.泰安抽水蓄能电站上水库面板堆石坝设计及优化[C] //华东勘测设计研究院.土石坝技术2007年论文集.北京:中国电力出版社,2007:81-87. 被引量:2
  • 4徐泽平著..混凝土面板堆石坝应力变形特性研究[M].郑州:黄河水利出版社,2005:235.
  • 5曹克明等著..混凝土面板堆石坝[M],2008:423.
  • 6赵增凯.我国高混凝土面板堆石坝筑坝技术新进展[C]//混凝土面板堆石坝筑坝技术与研究.2005. 被引量:1

共引文献3

同被引文献28

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部