摘要
由于受地形地质条件限制,溢洪道泄槽需设置平面转弯段过渡。本工程采用缓流转弯段,水流流态较好,槽身水流无明显的急流冲击波。
Limited by the topographic and geological conditions, the spillway chute shall establish a plane turning part for transition. This project adopts the glacis turning section, and the water flow pattern is preferable and there is no visible torrent shock wave in the chute.
关键词
苏家河口水电站
溢洪道
缓流转弯段
Sujiahekou Hydropower Station Spillway Glacis Tuming Section