摘要 华润置地郑州万象城购物中心(一期)为复杂超限高层建筑,建筑物体量庞大,房屋结构高度为40.65m,采用钢筋混凝土框架结构。结构中同时存在扭转不规则、平面开大洞、大悬挑、竖向构件不连续、斜柱等多项平面及竖向不规则情况。系统地介绍了针对结构多项超限的对策、计算分析方法、中庭部位地下室局部抗浮措施、平面大洞口间楼板弱连接设计、超长结构的楼板温度应力、大跨度及长悬臂构件设计、框架结构中楼梯构件的处理等设计关键问题。 The Commercial Part of Zhengzhou Huarun Mixc City Phase Ⅰis a huge size concrete frame structure with 40.65m high.The structure is irregular on many aspects,such as irregular torsion,big opening,large span canopy,uneven floor stiffness distribution,leaned column and etc.Some key techniques of design,such as countermeasures to solve the above problems,calculation and analysis methods,local anti floating measures in basement,weak connection design on floor with local big opening,temperature stress action for super long structure,design of large span and long cantilever members,stair component in frame structure and etc,were introduced.
出处 《建筑结构》 CSCD 北大核心 2013年第3期77-81,共5页 Building Structure
关键词 框架结构 局部抗浮设计 开大洞 温度应力 斜柱 frame structure local anti floating measure big opening temperature stress leaned column
  • 相关文献

参考文献2

二级参考文献5

共引文献1

同被引文献14

  • 1中华人民共和国住房和城乡建设部.JGJ94-2008建筑桩基技术规范[S].北京:中国建筑工业出版社,2008. 被引量:79
  • 2GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010. 被引量:947
  • 3JGJ3-2010高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2011. 被引量:258
  • 4中华人民共和国住房和城乡建设部.GB50010-2010混凝土结构设计规范[s].北京:中国建筑工业出版社,2010. 被引量:156
  • 5GB50009--2012建筑结构荷载规范[s].北京:中国建筑工业出版社,2012. 被引量:229
  • 6中华人民共和国住房和城乡建设部.GB50007--2011建筑地基基础设计规范[S].北京:中国建筑工业出版社,2011. 被引量:42
  • 7中华人民共和国住房和城乡建设部.GB50009-2012建筑结构荷载规范[S].北京:中国建筑工业出版社,2012. 被引量:46
  • 8DBJ 13-86-2007先张法预应力混凝土管桩基础技术规程[S].福州:福建省建设厅,2007. 被引量:1
  • 9马竹青.地下室底板抗浮锚杆结构设计[J].铁道标准设计,2010,30(6):108-110. 被引量:14
  • 10赵宝利.苏州地区某超高层建筑基础优化设计[J].建筑结构,2011,41(2):97-100. 被引量:12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部