期刊文献+

连续刚构桥悬臂施工阶段的预应力剪力滞效应分析 被引量:2

Analysis of Pre-stress Shear Lag during Construction of Continuous Rigid-frame Box Girder Bridge
下载PDF
导出
摘要 根据某三跨连续刚构桥的悬臂施工过程,分析了悬臂施工节段预应力荷载产生的箱梁剪力滞效应以及关键截面剪力滞效应的变化规律。结果表明,在悬臂施工过程中,悬臂预应力束会对箱梁产生正负剪力滞效应,且负剪力滞效应较大。 According to the structure characters of a typical three-span pre-stressed concrete continuous rigid-frame box girder bridge with single cell, the shear lag of box girder bridge is analyzed in the process of cantilever cast-in-place construction, and changes of shear lag is researched under the load case of pre-stress. According to the results, the positive shear lag and minus shear lag occur in the process of cantilever cast-in-nlace construction.
出处 《河北交通职业技术学院学报》 2006年第4期55-57,69,共4页 Journal of Hebei Jiaotong Vocational and Technical College
关键词 悬臂施工 宽箱梁 剪力滞 预应力 cantilever cast-in-place wide box-beam shear lag pre-stress
  • 相关文献

参考文献2

  • 1张士铎,王文州著..桥梁工程结构中的负剪力滞效应[M].北京:人民交通出版社,2004:155.
  • 2郭金琼主编..箱形梁设计理论[M].北京:人民交通出版社,1991:145.

同被引文献14

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部