期刊文献+

可用度限定的装备定期预防置换维修策略研究 被引量:1

Periodic Preventive Replacement Maintenance of Equipment Based on Limited Availability
下载PDF
导出
摘要 可用度是一种以比例或概率来衡量系统是否可以正常工作的参数,是衡量装备效能的重要指标。首先,以威布尔分布作为装备的失效密度函数,利用函数关系求出其期望函数;其次,在建立了似然函数后,用最大似然估计方法建立联合方程组,求出密度函数参数的估计值,该参数与装备的有效运行时间有关;第三,在可用度限定条件下,利用可用度函数求出装备的最佳预防置换维修周期及其维修次数;最后,以某装备为实例,在已知参数的条件下求出该装备的最优预防维修周期及其维修次数,证明了模型的有效性。 Availability is parameter to measure the proportion or probability of the system’ normal work ability, it’s an important factor to measure equipment performance. First, assume that the equipment failure density function obeying Weibull distribution, the expected function is calculated, which is the expected average life time of equipment. Second, the maximum likelihood estimation method is established to estimate the density function parameters. Third, the optimal preventive replacement maintenance of equipment and its repair cycle times are found out by using availability functions based on limited availability. Finally, the optimal preventive replacement maintenance and repair cycle times are obtained on the conditions of limited availability by taking certain equipment as an example, the results show the model is useful to equipment.
出处 《航空制造技术》 北大核心 2013年第1期134-136,143,共4页 Aeronautical Manufacturing Technology
基金 航空科学基金(2009ZG55018)资助
关键词 可用度 威布尔分布 定期预防维修置换 Availability Weibull distribution Periodic preventive maintenance Replacement
  • 相关文献

参考文献7

二级参考文献50

  • 1贾希胜,贾云献,温亮.以可靠性为中心的维修及其模型支持[J].军械工程学院学报,2004,16(1):15-18. 被引量:26
  • 2刘云生,张传富,张童,查亚兵,黄柯棣.基于Markov链的分布式仿真系统最佳检查点间隔研究[J].国防科技大学学报,2005,27(5):73-77. 被引量:9
  • 3刘宝友,方攸同,魏金祥,王永亮.状态维修机械设备的可靠性和检测更换策略[J].机械工程学报,2006,42(3):30-35. 被引量:20
  • 4NAKAGAWA T. Optimal policy of continuous and discrete replacement with minimal repair at failure[J]. Naval Research Logistics Quarterly, 1984, 31(4) :543-550. 被引量:1
  • 5CANFIELD R V. Cost optimization of periodic preventive maintenance[J]. IEEE Transactions on Reliability, 1986, 3 (1) 78-81. 被引量:1
  • 6SHEU S, GRIFFITH W S, NAKAGAWA T. Extended optimal replacement model with random minimal repair costs[J].European Journal of Operational Research, 1995, 85 (3): 636-649. 被引量:1
  • 7MALIK M A K. Reliable preventive maintenance policy[J]. AIIE Transaction, 1979, 11(3):221-228. 被引量:1
  • 8NAKAGAWA T. Sequential imperfect preventive maintenance policies[J]. IEEE Transactions on Reliability, 1988, 37(3):295-298. 被引量:1
  • 9ZHOU X J, XI L F, LEE J. Reliability centered predictive maintenance scheduling for a continuously monitored system subject to degradation[J]. Reliability Engineering and System Safety, 2007, 92(4):530 534. 被引量:1
  • 10ETI M C, OGAJI S O T, PROBERT S D. Reducing the cost of preventive maintenance(PM) through adopting a proactive reliability-focused culture[J]. Applied Energy, 2006, 83(11) : 1235-1248. 被引量:1

共引文献64

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部