某工厂存在供暖热负荷(冬季)、生产工艺热负荷(全年),介绍该厂热力站及二级管网的系统流程,探讨了换热器、二级主干线供回水压差控制策略。
There are space heating load in winter and annual process heating load in a factory. The system flow of the substation and the secondary circuit of the factory are introduced. The control strategies of heat exchanger and pressure difference between supply water and return water in secondary trunk main are discussed.