期刊文献+

黄金坪水电站地下厂房岩壁梁开挖施工技术实践与研究 被引量:2

Application and Research on the Excavation Technology of Ledge Beam in the Underground Powerhouse of Huangjinping Hydropower Station
下载PDF
导出
摘要 针对黄金坪水电站地下厂房围岩岩性较差的地质状况,岩壁梁开挖采取超前固结灌浆、"个性化"装药等措施,施工过程中精心设计、严格控制爆破参数,检测结果表明,爆破开挖效果良好,可供类似工程参考。 According to the poor surrounding rock properties of underground powerhouse of Huangjinping Hydropower Station, the measures such as advanced consolidation grouting and customized explosive charge are applied in the ledge beam excavation. With careful design and strict control of blasting parameters during the construction process, the test results indicate that good blasting excavation effects are achieved. The content has a certain reference value to similar projects.
出处 《水电与新能源》 2013年第1期12-15,共4页 Hydropower and New Energy
关键词 黄金坪水电站 地下厂房 岩壁梁 开挖施工 Huangjinping Hydropower Station underground powerhouse ledge beam excavation