MRPII、精益生产、TOC生产计划模式比较初探
被引量:6
摘要
本文简单介绍了生产计划的定义和作用,并简要分析了MRPII原理下的生产计划模式和精益生产下的生产计划模式的优缺点,最后详细阐述了TOC理论下的生产计划与控制方法DBR的方法和优点。
二级参考文献12
-
1[1]RONDEAU P J, LITTERAL L A. Evolution of manufacturing planning and control systems: From reorder point to enterprise resource planning[J].Production and Inventory Management Journal,2001,42(2): 1-7. 被引量:1
-
2[2]GOLHAR D Y, STAMM C L. The Just-in-time philosophy:a literature review [J]. International Journal of Production Research, 1991,29(4):657-676. 被引量:1
-
3[3]GOLDRATT E M. Computerized shop floor scheduling[J].International Journal of Production Research, 1988,26(3):443-55. 被引量:1
-
4[4]PTAK C A.MRP, MRPII, OPT, JIT, and CIM - succession,evolution, or necessary combination [J]. Production and Inventory Management Journal, 1991,32(2):7-11. 被引量:1
-
5[6]PLENERT G, BEST T D. MRP, JIT and OPT: What's"best"? [J]. Production and Inventory Management, 1986,27(2):22-29. 被引量:1
-
6[7]COOK D P. A simulation comparison of traditional, JIT, and TOC manufacturing system in a flow shop with bottlenecks[J]. Production and Inventory Management Journal, 1994(1-5):73-78. 被引量:1
-
7[8]TAYLORⅢ L J.A simulation study of WIP inventory drive systems and their effect on financial measurements[J] .Integrated Manufacturing Systems, 1999,10(5):306-315. 被引量:1
-
8[9]YANRADEE P. Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory[J].Computers Industrial Engineering, 1994,27(1-4):217-220. 被引量:1
-
9[11]SPENCER M S, COX J F. Optimum production technology(OPT) and the Theory of Constraints (TOC): analysis and genealogy [J]. International Journal of Production Research,1995,33(6): 1495-1504 被引量:1
-
10[12]BLAKE N, HELLBERG R. Relevance lost? A critical discussion of different cost accounting principles in connection with decision making for both short and long term production scheduling[J] .International Journal of Production Economics, 1991,24:1-18. 被引量:1
共引文献28
-
1张康,苏春,许映秋.单元化制造的生产计划和控制模式研究[J].成组技术与生产现代化,2006,23(1):34-37. 被引量:4
-
2张青山,王静.顾客为中心生产的集成化计划与控制方法研究[J].管理工程学报,2008,22(1):151-154. 被引量:2
-
3朱培军,刘飞,曹乐.MRPⅡ、JIT与TOC集成生产管理模式研究及应用[J].现代制造工程,2008(9):35-38. 被引量:11
-
4陆凤海,刘斌,王吉勤.流程型与离散型工业生产计划与控制的比较研究[J].装备制造技术,2009(4):124-126. 被引量:3
-
5张鹏.基于OPT的车间作业计划中瓶颈识别问题的研究与系统实现[J].沈阳师范大学学报(自然科学版),2009,27(3):338-341. 被引量:2
-
6王胜强,康健.基于MRPⅡ、NPT、TOC的生产计划策略研究[J].甘肃科技,2009,25(20):81-84. 被引量:3
-
7侯伟,李端峰.TOC与MRPⅡ JIT生产管理模式的比较[J].大众商务(下半月),2009(12):122-123. 被引量:2
-
8蒋南云,蒋珉,蔡虹,樊树海.多产品串并联连续生产系统主生产计划方法[J].工业工程,2009,12(6):28-32. 被引量:2
-
9郑冬标,邢晓龙.江南造船数字化生产计划关键技术应用[J].上海造船,2010(2):72-78. 被引量:7
-
10陆政峰.基于推拉式生产控制策略的库存削减研究[J].物流技术,2010,29(12):118-120. 被引量:2
同被引文献43
-
1陈建华,彭鸿广.基于时间竞争的MRPⅡ、JIT与TOC集成化生产管理模式[J].工业工程与管理,2004,9(6):75-79. 被引量:5
-
2王军强,张翠林,孙树栋,付平.MRPII、JIT、TOC生产计划与控制比较研究[J].制造业自动化,2005,27(2):9-13. 被引量:29
-
3陈建华,彭鸿广.基于时间竞争的MRPⅡ、JIT与TOC集成化生产计划与控制模型[J].工业工程,2005,8(2):66-69. 被引量:14
-
4Hammer M. Reengineering Work: Don't Automate, Obliterate[J]. Harvard Business Review, 1990, 68 (4) : 104-112. 被引量:1
-
5Featured Project Series: Convert-a-Card [EB/OL]. [2015-12-05]. http: //www.libcrowds.com/project/ category/featured/. 被引量:1
-
6Fox R E.MRP,Kanban,or OPT:What's best?[J].Inventories and Production,1982,2(4):3-11. 被引量:1
-
7Ramsay M L,Brown S,Tabibzadeh K.Push,pull and squeeze shop floor control with computer simulation[J].Industrial Engineering,1990,22:39-45. 被引量:1
-
8Watson K J,Blackstone J H,&:Gardiner S C.The evolution of a management philosophy:the theory of constraints[J].Journal of Operations Management,2007,25(2):387-402. 被引量:1
-
9Plenert G.Focusing material requirements planning (mrp) towards performance[J].European Jour- nal of Operational Research,1999,119(1):91-99. 被引量:1
-
10Sivasubramanian R,Selladurai V,Rajamramasamy N.The effect of the drum-buffer-rope (dbr) approach on the performance of a synchronous manufacturing system (sms)[J],Production Planning &c Control,2010,11(8):820-824. 被引量:1
引证文献6
-
1侯清麟,王楠.基于时间的敏捷性的生产计划管理与控制集成模型JITⅡ模式[J].商场现代化,2014(25):57-59. 被引量:1
-
2经渊,陈雅,郑建明.社会数字文化项目管理流程再造研究[J].图书馆论坛,2016,36(6):67-73. 被引量:2
-
3夏灿明,楼园,齐霄.约束理论在H公司生产系统的应用[J].数学的实践与认识,2016,46(13):93-102. 被引量:8
-
4赵静,张新敏.基于约束理论的汽车配件企业生产调度研究[J].江苏科技信息,2017,34(7):30-32. 被引量:2
-
5鲁玉军,金倩倩.基于MES系统的精益生产计划与控制模型研究[J].经营与管理,2017(5):92-95. 被引量:7
-
6赵泽钰,彭来湖,胡旭东,沈春娅,汪松松.基于约束理论的针织数字车间排产优化方法[J].轻工机械,2020,38(3):100-104. 被引量:1
二级引证文献21
-
1谭敏清,陈文征,杨刚.智能排程系统在实验室中的应用[J].实验室检测,2024(2):54-58.
-
2翟建春.浅谈项目管理在企业运行中的应用[J].河北企业,2016,0(10):12-13.
-
3金国良,周炳海.阀门产品的零件编码研究[J].机械制造,2016,54(10):57-59.
-
4薛甚兰,袁梦妮.交易成本理论对我国生产型企业非生产性成本控制的影响[J].财会学习,2017(8):83-84. 被引量:2
-
5王淼,孙红蕾,郑建明.公共数字文化:概念解析与研究进展[J].现代情报,2017,37(7):172-177. 被引量:39
-
6李航,蒋高明,吴志明.物联网技术在针织行业的应用现状及发展趋势[J].纺织导报,2018,0(3):26-29. 被引量:3
-
7佘俊,黄嘉东,钟保强,钟建栩,朱珠.发电企业生产系统的组件化设计[J].现代电子技术,2018,41(9):165-169.
-
8范江东,徐建斌,孙小江.基于约束理论的配电网物资智能采购配送[J].中国流通经济,2019,33(3):91-101. 被引量:10
-
9许帅.浅议中小企业应用ERP问题及解决策略[J].新财经,2019,0(23):127-129.
-
10李俚,夏晶,李露,桂黎红.瓶颈工序影响下汽车电子生产车间排程研究[J].现代制造工程,2020(3):26-32. 被引量:5
-
1芮剑锋,杨建军,石艳.基于TOC及启发式规则的生产计划与控制方法[J].航空制造技术,2012,55(7):76-80. 被引量:2
-
2俞鲲,杨建军.推拉结合的生产计划与控制方法的应用研究[J].成组技术与生产现代化,2012,29(2):40-45. 被引量:3
-
3郑秋雁,钱静.基于DBR模型的生产排程研究[J].机械制造,2014,52(5):45-48. 被引量:2
-
4郭建花,吴禹城,董书伟.压力容器产品质量检验计划模式[J].机电一体化,2014,20(1):126-126.
-
5孙宝凤,田小川,肖伟,马丽丽.再制造系统的Drum-Buffer-Rope仿真建模[J].吉林大学学报(工学版),2008,38(4):852-857.
-
6韩平,杨清立,陈凌凌.基于DBR的生产控制方法研究[J].佳木斯大学学报(自然科学版),2009,27(2):259-261. 被引量:2
-
7王党福,易红,黄和风,吴锡英.并行工程中CAPP技术的探讨[J].组合机床与自动化加工技术,1994(9):17-20. 被引量:2
-
8WU ChaoMin1, SHANG JingZhi1, ZHANG BaoPing1,2, ZHANG JiangYong1,3, YU JinZhong1,3 & WANG QiMing1,31 Department of Physics and Semiconductor Photonics Research Center, Xiamen University, Xiamen 361005, China,2 Pen-Tung Sah Micro/Nano Technology Research Center, Xiamen University, Xiamen 361005, China,3 State Key Laboratory on Integrated Optoelectronics, Institute of Semiconductors, Chinese Academy of Sciences, Beijing 100083, China.Impact of thickness of GaN buffer layer on properties of AlN/GaN distributed Bragg reflectors grown by metalorganic chemical vapor deposition[J].Science China(Technological Sciences),2010,53(2):313-316. 被引量:2
-
9赵广英,余勇.普通光学显微镜的改进[J].教学仪器与实验,2015,31(3):31-32.
-
10列光华,卢洪斌.采用DBRLD的正弦相位调制激光干涉仪[J].光电工程,2001,28(6):69-72.