大跨度梁拱组合式渡槽关键施工技术 被引量:2

Key technologies for construction of large span arch-beam composite aqueduct
下载PDF
导出
摘要 南水北调工程中线李村北干渠渡槽为梁拱组合式渡槽,总计分十二个阶段建成,过程控制复杂。施工期间,结合现浇梁段布置,将预应力张拉分三个阶段完成,逐步施加预应力。底模支撑以土胎膜为主,碗扣架为辅,可充分适应复杂结构特点。后期卸载时根据体系转换的要求,遵循对称均衡的原则,分四阶段完成,全面实现了设计意图。 Licun North Main Canal Aqueduct of the mid-route of the South-to-North Water Transfer Project is an arch-beam eomposite aqueduct; of which the construction consists of 12 phases and the process control is quite complicated. During the construction, the pre-stress stretch is completed in three stages with the application of pre-stress step by step. The bottom die support mainly consists of soil mold with the complement of steel tube scaffolding with bowl type coupler, which can fully ae- eommodate the complicated structural features concerned. In accordance with the requirement on the system trausibrmation, the formwork is demounted in four stages within the late-phase of tile construction, and then the design intent is completely re- alized at last.
出处 《水利水电技术》 CSCD 北大核心 2013年第1期86-88,92,共4页 Water Resources and Hydropower Engineering
关键词 大跨度 梁拱组合 预应力 渡槽 南水北调工程中线工程 Key words: large span arch-beam composite pre-stress aqueduct the Mid-route Project of South-to-North Water TransferProject
  • 相关文献

参考文献2

二级参考文献2

  • 1[3]JTJO41-2000,公路桥涵施工技术规范[S]. 被引量:2
  • 2JTGD62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范.[S].,.. 被引量:130

共引文献53

同被引文献9

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部