期刊文献+

优化工艺提高X210CrW12冷作模具钢棒材成品率 被引量:1

OPTIMIZING PROCESS TO INCREASE THE YIELD OF X210CrW12 COLD WORKING DIE STEEL BAR PRODUCTS
下载PDF
导出
摘要 介绍X210CrW12冷作模具钢棒材产品的生产情况,对影响产品质量的主要问题,进行了细致分析,找出了原因。通过调整加热时间、轧制时间、压下量、咬入速度、隧道炉补温、控制张力因子等手段,结合优化工艺,减少了产品开花头和表面角裂等缺陷,提高成材率。 The production of X210CrW12 clod working die steel bar products was introduced. The main problems affecting the product quality were carefully analyzed. An optimizing process was performed, including adjusting heating time, rolling time, reduction amount, bite speed, tunnel furnace temperature compensation and controlling tension factor. All those redueed the defeets such as flower head and surface eorner cracks in products, and increased the product yield.
出处 《上海金属》 CAS 北大核心 2013年第1期58-62,共5页 Shanghai Metals
关键词 X210CrW12冷作模具钢 棒材 成品率 优化工艺 X210CrW12 Cold Working Die Steel, Bar, Yield, Optimizing Process
  • 相关文献

参考文献3

  • 1郭建亭.高温合金材料学应用基础理论[M]北京:科学出版社,20081. 被引量:1
  • 2黄乾尧.高温合金/特殊钢丛书[M]北京:冶金工业出版社,20004. 被引量:1
  • 3曹乃光.金属塑性加工原理[M]北京:冶金工业出版社,19836. 被引量:1

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部