特重型物件过桥的临时性加固技术方案探讨 被引量:2

Discussions on Temporary Reinforcement Technology Plan of Extra-heavy Object Gap-bridge
下载PDF
导出
摘要 文章结合山东省威海市嘉泰桥,对装载特重设备车辆荷载作用下的典型桥梁所采用的临时性加固技术方案进行了论证,具体阐述了加固方案的工艺流程及施工要点。通过通车前后病害的对比分析,发现该桥梁病害没有进一步的发展,表明该临时性加固方案是合理可行的。 Combined with Jiatai Bridge of Weihai City of Shandong,the article conducted the demonstration on temporary reinforcement technology plan used in the typical bridge under the load condition of vehicles loading the extra-heavy equipment, specifically described the technical process and construction keypo- ints of reinforcement plan.Through the comparative analysis on the diseases be- fore and after the vehicle passing,it identified that the bridge disease had no fur- ther development, indicating that this temporary reinforcement plan is reasonable and feasible.
出处 《西部交通科技》 2012年第11期16-19,共4页 Western China Communications Science & Technology
基金 国家973前期计划项目(2010CB334710) 重庆市重点自然科学基金(CSTC2011BA6026)
关键词 桥梁 特重型设备 超限车辆荷载 临时支撑加固技术方案 Bridge Extra-heavy equipment Oversized vehicle load Temporarysupporting reinforcement technology plan
  • 相关文献

参考文献7

二级参考文献3

  • 1JTG D60-2004.公路桥涵设计通用规范[S],2004. 被引量:1
  • 2JTG D62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[S],2004. 被引量:1
  • 3GB 50367-2006.混凝土结构加固设计规范[S],2006. 被引量:1

共引文献850

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部