摘要
深圳市"卓越梅林基坑支护项目"工程变形监测方案,对受紧邻基坑施工扰动影响的运行中的地铁隧道变形的自动化监测方法进行了分析,采用徕卡测量机器人TS30与SmartMonitor监测软件与SmartAnalyzer监测分析软件进行全自动监测,可以24 h无人值守,连续监测运行中的地铁隧道变形,且每次监测可在地铁运行间隔内迅速完成。监测到的数据可以实时提供给施工方,以指导当前及下一步的施工,在工程应用中取得了良好的效果。
Combined with the Shenzhen city" ZhuoYue -MeiLin foundation pit supporting project" engineering de- formation monitoring program, and analyzed the automated monitoring methods in the operating subway tunnel deformation effected by close to the foundation pit construction disturbance, using Leica surveying robot TS30 and Smart Monitor mo- nitoring software and Smart Analyzer monitoring analysis software for automatic monitoring, it can 24h unattended, contin- uous monitoring the operating subway tunnel deformation, and each monitoring can be quickly completed in subway oper- ation interval. The monitoring data can provide to the construction side in real time, to guide the current and the next step of construction, and achieved good results in engineering applications.
出处
《城市勘测》
2012年第6期143-147,共5页
Urban Geotechnical Investigation & Surveying
关键词
自动化监测
地铁隧道变形
测量机器人
Automated monitoring
subway tunnel deformation
surveying robot