大直径厚壁设备的制造

Manufacture of Large Diameter and Thick Wall Equipment
下载PDF
导出
摘要 脱碳塔设备直径较大,运输困难,采用分段预制、运输、现场安装的方案可减少现场安装工作量,提高压力容器的制造安装质量。文章结合工程实例,从预制深度、绘制排板图、筒体预制、变径段制造、椭圆封头制造、热处理、焊接、无损检测等介绍了该设备的制造过程。 Decarbonizing tower has a big diameter and its transportation is difficult.The construction scheme of segmented pre-manufacture and transportation then site assembly can reduce site installation workload and raise manufacture and installation quality.Combining with an engineering example,this paper introduces the manufacture course of the decarbonizing tower with regard to pre-manufacture depth,plate layout drawing,pre-manufacture of cylinder,manufacture of tapered segment and elliptical head,heat treatment,welding and nondestructive test.
作者 张亚兴
出处 《石油工程建设》 2012年第6期69-72,109,共4页 Petroleum Engineering Construction
关键词 脱碳塔 大直径厚壁设备 分段预制 现场安装 decarbonizing tower large diameter and thick wall equipment segmented manufacture site installation
  • 相关文献

参考文献1

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部