摘要
高桩梁板式码头桩基施工中,桩的偏位问题始终是桩基工程质量控制的重点。文章就沉桩的偏位原因进行多方面分析,并提出一些行之有效的施工过程中的纠偏措施。
In high piled beam slab wharf foundation construction,pile deviation has always been the focus of quality control of pile foundation engineering.In this paper,the cause of piling deviation is analyzed from various aspects,and some effective measures are proposed.
出处
《科教文汇》
2012年第6期71-71,203,共2页
Journal of Science and Education
关键词
桩基
沉桩偏位
纠偏措施
pile
pile deviation
rectification measures