引汉济渭隧洞施工若干技术问题探讨 被引量:6

Discussions of Several Technical Issues of the Tunnel Construction in the Han-to-Wei Diversion Project
下载PDF
导出
摘要 隧洞施工,需要建设各方密切配合,根据围岩变化及时确定安全可靠、经济合理的支护措施和施工方案。就隧洞施工中的动态设计、超前预报、开挖方式、初期支护、二次衬砌与掌子面的距离等常常遇到的若干技术问题结合有关技术文件和规范进行了探讨,希望能引起引汉济渭工程建设者的关注。 The tunnel construction takes very close and active cooperation from all the parcipants involved in the construction, and particularly the timely determination of the safe, relialbe, economical and reasonable supporting measures and constrcution method according to changes of the surrounding rock. This paper explores several technical questions such as the dynamic tunnel construction design, advanced prediction, excavation method, initial support and secondary lining and working face distance, and discusses the related technical sepcifications, standards and norms in the hope to attract due attention from the participants of the project construction.
出处 《电网与清洁能源》 2012年第11期69-71,共3页 Power System and Clean Energy
关键词 引汉济渭 隧洞施工 技术探讨 Han-to-Wei Diversion Project tunnelconstruction technology discussion
  • 相关文献

参考文献5

  • 1国家冶金工业局.GB50086-2001锚杆喷射混凝土支护技术规范[S].北京:中国计划出版社,2001. 被引量:9
  • 2中铁第一勘察设计院集团有限公司.陕西省引汉济?胃工程秦岭隧洞越岭段6号洞工区《主洞勘探试验段设计报告》[R].2011. 被引量:1
  • 3中华人民共和国水利部.SL378-2007水工建筑物地下开挖工程施工规范[S].北京:中国水利水电出版社,2008:30. 被引量:3
  • 4中华人民共和国水利部.SL377-2007水利水电工程喷锚支护技术规范[S].北京:中国水利水电出版社,2008. 被引量:1
  • 5中华人民共和国交通运输部.JTGF60-2009公路隧道施工技术规范[s].北京:人民交通出版社,2009. 被引量:9

共引文献18

同被引文献4

引证文献6

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部