摘要
大坳水电站采用了全计算机监控模式 ,取消了常规的监控设备 本文对该电站计算机监控系统的结构。
The total computer monitoring pattern was adopted in Daao hydropower station and the routine monitoring equipment was concelled.This paper introduced the structure and function of computer monitoring system on this station.
出处
《江西水利科技》
2000年第2期104-108,共5页
Jiangxi Hydraulic Science & Technology
关键词
大坳水电站
计算机
监控系统
Daao hydropower station
Computer
Monitoring System