摘要 以某工程为例,通过对招标文件、专用条款、技术条款、工期及进度指标分析、TBM采购方式、业主招标控制价价格等因素评审,结合类似项目已完工程TBM掘进工程成本,制订了项目投标报价策略,以便工程应用。 Taking some project as the example, the paper reviews some factors, including the bidding documents, the special and technical terms and conditions, the construction period, the progress index analysis, TBM purchase ways, and the bidding control and pricing for owners, and makes out the bidding and pricing strategies for the program by combining with the tunneling engineering cost for the finished projects of similar programs, so as to adopt it in projects.
作者 刘占平
出处 《山西建筑》 2012年第34期265-266,共2页 Shanxi Architecture
关键词 TBM 投标报价策略 成本 TBM, bidding and pricing strategies, cost
  • 相关文献

参考文献6

  • 1中铁隧道集团大伙房水库输水工程TBM2标项目部.辽宁省大伙房水库输水工程TBM2标施工技术总结[Z].2008:30-31. 被引量:1
  • 2中铁隧道集团大伙房水库输水工程TBM2标项目部.辽宁省大伙房水库输水工程TBM2标施工审计后的结算报表[Z].2011:1-20. 被引量:1
  • 3中铁隧道集团大伙房水库输水工程TBM2标项目部.辽宁省大伙房水库输水工程TBM2标施工完工财务报表[Z].2011:1-30. 被引量:1
  • 4GF-2000-0208,水利水电工程土建工程施工合同条件[S]. 被引量:1
  • 5全国造价工程师执业资格考试培训教材编审组编..2009年版全国造价工程师执业资格考试培训教材 工程造价计价与控制[M].北京:中国计划出版社,2009:355.
  • 6中铁隧道集团西安至安康铁路秦岭隧道Ⅰ线进口完工审计后的结算表[Z].2000:10-11. 被引量:1