摘要
在粮食仓储物流工程项目建设过程中,机电设备安装和土建施工交叉进行已经是一个普遍现象。作者根据多年现场实践经验,对交叉施工中交叉节点选择、交叉施工统筹、成品保护、施工安全保障、质量控制、进度控制以及费用控制等环节进行分析,对交叉施工提供一些借鉴和帮助。
During the construction of grain storage and logistics engineering, it is very common that the installation of mechanical and electrical equipments and the construction of the civil work are cross. Based on years of practical experience, the paper has an analysis on cross construction of cross node selection, cross construction as a whole, finished product protection, construction safety control, quality control, progress control, cost control and so on, which provide some reference and help to cross construction.
出处
《粮食流通技术》
2012年第5期13-16,共4页
Grain Distribution Technology
关键词
粮食仓储物流工程
交叉施工
探讨
Grain storage and logistic engineering
cross construction
discussion