期刊文献+

新型板柱-抗震墙体系在某超高层建筑的应用 被引量:1

Application of new system of slab-column-shear walls structure on a supper tall building
原文传递
导出
摘要 现行规范对于板柱-抗震墙结构的适用高度作了较严格的规定,限制了板柱-抗震墙结构在超高层结构中的使用。以某实际超高层建筑(目前全国在建的最高的板柱-抗震墙结构)设计计算为例,针对该结构体型的抗震性能弱点提出有效可行的解决方案,并将该新型的板柱结构体系应用于超高层建筑中。 The current specifications give strict requirements by limiting the building height of the slab-column-shear wall structure. The requirements limit the use of the slab-column-shear wall system in many real projects, especially, in super tall buildings. A practical design method through a real building was presented, which is currently the highest tall building using slab-column-shear wall system in China. The effective and feasible solutions were proposed aiming at the study of structural weaknesses of the seismic performance and the new slab-column structural system was applied in supper tall buildings.
出处 《建筑结构》 CSCD 北大核心 2012年第11期61-65,共5页 Building Structure
关键词 板柱-抗震墙结构 适用高度 抗震性能 板柱节点 slab-column-shear wall structure applicable height seismic performance slab-column joint
  • 相关文献

参考文献4

二级参考文献7

  • 1.高层建筑混凝土结构技术规程(JGJ 3—2002)[S].北京:中国建筑工业出版社,2002年.. 被引量:1
  • 2.混凝土结构设计规范(GB 50010—2002)[S].北京:中国建筑工业出版社,2002年.. 被引量:1
  • 3.北京市建筑设计研究院内部资料.结构专业技术措施[R].,1992.. 被引量:1
  • 4.建筑抗震设计规范(GB 50011-2001)[S].北京:中国建筑工业出版社,2001.. 被引量:1
  • 5.GB50011- 2001.建筑抗震设计规范[S].,.. 被引量:1
  • 6CECS 28-1990.钢管混凝土结构设计与施工规程[S]..1990 被引量:3
  • 7林勇军,姚晋华.名盛广场地下室逆作法施工技术[J].广东土木与建筑,2003,10(10):51-53. 被引量:4

共引文献30

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部