期刊文献+

百万千瓦级核电蒸汽发生器管子-管板焊缝制造工艺研究 被引量:2

Manufacturing Process for Tube Sheet Weld of Million-kilowatt-class Nuclear Power Steam Generator
下载PDF
导出
摘要 通过对国产百万千瓦级核电蒸汽发生器管子-管板密封焊缝制造的工艺过程分析,指出了当前制造工艺和技术规范的问题和不足,为蒸汽发生器设计方和设备制造厂进一步改进和完善技术规范和制造工艺提供了实践依据和建议。 The manufacturing process of million-kilowatt-class nuclear power steam generator tubes to tube sheet seal weld was researched. By analyzing the manufacturing process of steam generator tube-to-tube sheet weld, the problem and deficiency on the current manufacturing process and technical specification were pointed out, and also gave a practical basis and advices for the steam generator designer and equipment manufacturing plant to improve and perfect the technicalspecifications and manufacture process.
出处 《热加工工艺》 CSCD 北大核心 2012年第21期182-184,186,共4页 Hot Working Technology
关键词 蒸汽发生器 管子-管板焊缝 工艺 返修 stream generator tube to tube sheet weld seam process repairing
  • 相关文献

参考文献2

共引文献12

同被引文献24

引证文献2

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部