摘要
对客运专线工程实施过程中的过渡方案进行分析对比,并提出一些想法。
The paper gives the analysis and comparison of the engineering transfer schemes during the implementation of Harbin-Dalian high-speed railway project, and puts forward a related opinion.
出处
《铁路通信信号工程技术》
2012年第5期73-75,共3页
Railway Signalling & Communication Engineering
关键词
哈大客运专线
长春
过渡
信号
Harbin-Dalian high-speed railway
Changchun
transfer
signal