对北京地铁亦庄线(2010年12月底开始试运营)试运营期间的运营状况进行追踪分析,对试运营中反映出的问题进行反思,从两线衔接、预留线位、设计习惯做法、运营需求、设计专业配合等方面分析地铁建设在设计阶段应注意的问题,对如何提高新建地铁项目的设计质量及服务水平提出建议。
Beijing metro Yizhuang line entered into trial operation at the end of December 2010.General designer made tracing analysis on the operation situation of Yizhuang line during the trial operation.Rethinking the problems during the operation of Yizhuang line,the author summarized the problems that should be paid attention to at the planning and design stages in metro construction in terms of connection of two lines,reserved line position,design routine practices,operational demands and design coordination and so on.Proposals are put forward to improve the design quality and service level of new projects.