从北京地铁亦庄线运营实践谈如何提高地铁设计质量

Comments on Improving Metro Design Quality from the Operation Practice of Beijing Metro Yizhuang Line
下载PDF
导出
摘要 对北京地铁亦庄线(2010年12月底开始试运营)试运营期间的运营状况进行追踪分析,对试运营中反映出的问题进行反思,从两线衔接、预留线位、设计习惯做法、运营需求、设计专业配合等方面分析地铁建设在设计阶段应注意的问题,对如何提高新建地铁项目的设计质量及服务水平提出建议。 Beijing metro Yizhuang line entered into trial operation at the end of December 2010.General designer made tracing analysis on the operation situation of Yizhuang line during the trial operation.Rethinking the problems during the operation of Yizhuang line,the author summarized the problems that should be paid attention to at the planning and design stages in metro construction in terms of connection of two lines,reserved line position,design routine practices,operational demands and design coordination and so on.Proposals are put forward to improve the design quality and service level of new projects.
作者 郭建平
出处 《都市快轨交通》 北大核心 2012年第4期38-42,共5页 Urban Rapid Rail Transit
关键词 北京地铁亦庄线:两线衔接 预留线位 运营需求 地铁建设 规划设计 Beijing metro Yizhuang line connection of two lines reserved line position operational demand metro construction planning and design
  • 相关文献

参考文献8

  • 1GB50157-2003地铁设计规范[S].北京:中国计划出版社,2003. 被引量:313
  • 2北京市市政工程设计研究总院.北京市轨道交通亦庄线工程可行性研究报告[R].北京,2007. 被引量:1
  • 3北京地铁运营公司科研所.北京亦庄轻轨客流分析及预测[R].北京,2006. 被引量:1
  • 4北京市市政工程设计研究总院.北京市轨道交通大兴线工程可行性研究[R].北京,2007. 被引量:1
  • 5北京市市政工程设计研究总院.北京市轨道交通亦庄线工程施工图[R].北京,2007. 被引量:1
  • 6北京市轨道交通指挥中心.北京市五条新域线客流情况[R].北京,2011. 被引量:1
  • 7北京市市政工程设计研究总院.北京市轨道交通亦庄线工程初步设计:线路及行车组织[G].北京,2008. 被引量:1
  • 8北京市市政工程设计研究总院.北京市轨道交通亦庄线工程施工图设计文件[G].北京,2009-2010. 被引量:1

共引文献312

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部