摘要
在惠山区污水收集系统整体布局的框架下,针对工程地质条件、区域规划调整、道路建设时序、工程造价等多方面的影响因素,介绍了惠山区各污水处理厂污水系统的调整、优化及其实施情况。
In the overall layout framework of wastewater system of Huishan District,aiming at the influencing factors of engineering geological conditions,adjustment of regional planning,construction time sequence of roads,engineering construction costs and so on,the article introduces the adjustment,optimization and implementation of each wastewater system in wastewater treatment plant of Huishan District.
出处
《城市道桥与防洪》
2012年第9期170-174,336,共5页
Urban Roads Bridges & Flood Control
关键词
惠山区
污水收集系统
规划
调整与优化
实施
Huishan District,wastewater collection system,planning,adjustment and optimization,implementation