摘要
通过对某铁路工程桥涵进行变更设计统计分析,明确产生变更的原因,并采取相应的对策,使设计变更降低到最低限度,确保工程质量,控制工期、费用达到预期目的。
Statistical analysis on the design alteration of railway bridge and design alteration were found. Appropriate measures were taken culvert was carried out, and the to reduce the design alteration to to ensure project quality, and to control the construction period and cost to anticipation.
出处
《筑路机械与施工机械化》
2012年第8期75-76,共2页
Road Machinery & Construction Mechanization
关键词
桥涵
变更设计
原因
分析
bridge and culvert
design alteration
cause
analysis