摘要
某工程柱顶共设计12个斗拱,采取分层浇筑混凝土的施工方法,利用全站仪三维坐标定位技术,精确控制斗拱横梁之间的相交角度,先制订施工关键技术,再由面到点逐步深化,完善施工方案,确定施工工艺,最终完成了斗拱施工任务。
12 bucket arches are designed on the column Total station 3D positioning technique is adopted to accurately beam. Key construction technique is established, deepened successfully finish the construction of bucket arch. top in a project and they are poured in layers. control the skew angle between bucket arch and and improved from plane to point gradually to
出处
《建筑技术》
2012年第10期940-943,共4页
Architecture Technology
关键词
斗拱
三维坐标定位
超大清水混凝土
bucket arch
3D coordinate positioning
super-large as-cast finish concrete