摘要
基于抽水蓄能电站建设的工程实践,多方面、多角度地对不同类型的地下厂房布置从进厂方式、主厂房布置、母线洞布置、主变洞布置等进行分析对比和归纳总结,以期寻求厂房布置最优的设计方案,利于电站的土建施工、设备安装和投运后的运行管理。
Based on the engineering practice of construction of pumped storage power station, layouts of underground powerhouses in various types are compared, analyzed and summarized, in terms of multiple aspects and views, from entering mode, powerhouse layout, busbar cavern layout and main transform cavern layout, etc so as to seek optimum design scheme for powerhouse layout for benefits of civil works construction, equipment installation and operation management after being put into service of the power station.
出处
《西北水电》
2012年第S01期91-97,共7页
Northwest Hydropower
关键词
抽水蓄能电站
地下厂房
布置
Pumped storage power station
underground powerhouse
layout