期刊文献+

煤矿开拓方案选择的层次灰关联决策 被引量:1

Choice of coal mines development scheme selection by hierarchical grey relational decision
下载PDF
导出
摘要 本文从井巷工程、工业场地、场外公路、主要设备、开拓方式、井筒水文地质、到火车的距离等七个方面建立了煤矿开拓方案评价的指标体系,并利用层次分析法与灰关联决策相结合的方式进行煤矿开拓方案的选择,进而给出煤矿开拓方案选择层次灰关联决策的具体步骤,最后进行实例应用。 Index system of valuation of developing scheme of coal mines are established in this paper. There are sev- en aspects are included in this index system, such as sinking and driving engineering, industrial site, offsite highway, the main equipment, the development method, borehole hydrogeology, the distance between train station and so on. By using the combination of analytic hierarchy process (AHP) and grey correlation decision, developing scheme of coal mines are selected, and the specific steps of analytic hierarchy process (AHP) and grey correlation decision are shown in this pa- per. Finally, an application example was put into use in this paper.
出处 《内蒙古煤炭经济》 2012年第9期54-55,共2页 Inner Mongolia Coal Economy
关键词 煤矿开拓方案 选择 层次分析法 灰关联决策 : developing scheme of coal mines Choice Analytic Hierarchy Process Grey relational decision
  • 相关文献

参考文献4

二级参考文献3

共引文献5

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部