摘要
郑州市嵩山路-黄郭路-南三环路立交桥的主桥、匝道定位放线、标高传递、变形观测等施工测量工作,均采用传统的三角网控制技术,为此要求测量人员有责任心,熟悉测量规范和设计文件,掌握施工计划,结合现场条件精心放样,施工中随时检查校核,确保了工程质量和施工顺利。
Traditional triangular mesh control technique is clover-leaf junction of Gaoshan Road, Huangguo Road and South adopted for Third Ring construction Road in Zh measurements of engzhou, including positioning and setting out of main overpass and ramp, elevation transfer and deformation observation, etc. Measuring workers are required to be responsible, be familiar with measurement specification and design document, master construction plan, and shall examine and verify the construction timely according to field conditions and careful setting out. Engineering quality and smooth construction are successfully ensured.
出处
《建筑技术》
2012年第9期806-809,共4页
Architecture Technology
关键词
工程测量
三角网
平面控制
engineering measurement
triangular mesh
plane control