摘要
以海南洋浦30万吨级原油码头及配套储运设施工程为例,从设计、施工、后期维护和全寿命期成本方面研究钢管桩的牺牲阳极和外加电流两种阴极保护全寿命期方案。
Taking the 0.3 million DWT crude oil terminal and associated storage and transportation facilities project in Yangpu harbor of Hainan province as an example,this paper studies two throughout-life-cycle cathodic protection methods including sacrificial anode protection and impressed current protection from design,construction,latter maintenance and the whole life cycle cost.
出处
《水运工程》
北大核心
2012年第8期77-81,共5页
Port & Waterway Engineering
关键词
设计
施工
后期维护
全寿命期成本
牺牲阳极
外加电流
design
construction
latter maintenance
whole life cycle cost
sacrificial anode
impressed current