期刊文献+

桃树坪隧道富水粉细砂地层挑高段设计方案优化 被引量:2

Design Optimization of the Upward Transition Section from the Inclined Shaft to the Taoshuping Main Tunnel in Water-Rich Sandstone Stratum
下载PDF
导出
摘要 桃树坪隧道穿越富水粉细砂地层,施工难度很大,尤其是斜井进正洞的挑高段施工风险更高。通过对四种方案在施工工序、支护形式及体系转换等方面的比选,最后选择采用导洞爬高进入正洞双侧壁导洞高度进行导洞施工、后进行中间部分施工的设计方案,顺利完成了隧道施工。文章详细介绍了四种比选方案及方案实施效果。 The construction of the Taoshuping tunnel passing through water-rich fine sandstone stratum was dif-ficult, especially the upward transition section from the inclined shaft to the main tunnel. Based on a comparison of four schemes in regards to construction consequence, support pattern, and system changes, the selected final option was to excavate a pilot tunnel from the inclined shaft to the upper part of the main tunnel and then construct the headings and middle part. The four comparative schemes are introduced and their effects are presented.
出处 《现代隧道技术》 EI 北大核心 2012年第4期69-75,共7页 Modern Tunnelling Technology
关键词 隧道施工 富水粉细砂 挑高段 双侧壁导洞 方案比选 Tunnel construction Water-rich fine sandstone Upward transition section Pilot in double sidewall Scheme comparison
  • 相关文献

参考文献7

二级参考文献24

共引文献62

同被引文献17

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部