枕头坝一级水电站工程枢纽布置设计 被引量:6

General layout design of Zhentouba Hydropower Station Ⅰ
下载PDF
导出
摘要 枕头坝一级水电站枢纽由挡水、泄水、电站等建筑物组成。施工导流方式和导流建筑物与泄洪建筑物的结合是枢纽布置的关键问题。结合地形地质条件及各建筑物的结构特点,并考虑枢纽布置、泄洪消能条件、施工条件、经济、安全等要素,重点介绍了枕头坝一级水电站首部枢纽布置设计及比选过程。经过分析论证,最终选择了左岸引水发电建筑物+右岸5孔泄洪闸(其中3孔位于导流明渠内)的枢纽布置方案。 Zhentouba Hydropower Station I consists of the water - retaining, spillway and power generating structures. The way of construction diversion and the integrating arrangement of diversion project and spillway structure are the key issues that influ- ence the general layout deeply. According to the geographic and geologic condition at the dam site and the structural characteris- tics, and considering the general layout, flood discharge, construction condition, economic condition and safety, we present the general layout design of the hydro - complex and its comparison process. The adopted scheme is as follow: power generating building at the left bank and 5 flood discharge sluices at the right bank (3 of them arranged in the open diversion channel).
出处 《人民长江》 北大核心 2012年第14期30-32,共3页 Yangtze River
关键词 枢纽布置设计 布置方案 方案比选 枕头坝一级水电站 general layout design layout scheme scheme comparison and selection Zhentouha Hydropower Station I
  • 相关文献

同被引文献17

引证文献6

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部