东北电网峰谷差及水电规划开发

The Difference between Peak and Valley of the Northeast Power Pool and Hydropower Planning and Development
下载PDF
导出
摘要 随着社会经济的发展和电力市场的变化 ,东北电网峰谷差不断加大 ,供需矛盾日益尖锐 ,规划水电开发项目 ,开发建设抽水蓄能、扩建混合抽水蓄能、扩建机组、实施老旧机组改造 ,以增加水电装机容量 ,提高系统调峰能力 。 With the development of society and economy and the change of the power market, the difference between peak and valley of the Northeast power pool is steadily increasing and the contradiction between supply and demand is becoming increasingly acute. It is therefore imperative to make plans for hydropower development projects and those for building pumped storage power stations, extending mixed pumped storage stations and pumped storage groups as well as innovating old ones so as to increase the hydropower installed capacity, improve the peak modulating capability and meet the demand of the power market.
机构地区 桓仁发电厂
出处 《水电能源科学》 2000年第2期66-68,共3页 Water Resources and Power
关键词 东北电网 峰谷差 水电规划 开发建设 Northeast power pool difference between peak and valley hydropower planning development and construction
  • 相关文献

参考文献2

  • 1宋恩来.东北水电站的经济效益和社会效益[J].东北水力发电学报,1998,(5):1-4. 被引量:1
  • 2张正平.东北地区水电项目造价及建设管理问题的探讨[J].东北水力发电学报,1999,(3):1-4. 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部