期刊文献+

高铁含锌烟尘浸出工艺研究 被引量:3

Study on Leaching Process of High-iron Zinc Dust
下载PDF
导出
摘要 对锌烟尘硫酸浸出提取锌工艺条件进行了研究,分别采用正交试验与单因素试验考察浸出酸浓度、液固比、浸出时间、浸出温度对锌烟尘中锌、铁的浸出率的影响。结果表明:较优浸出工艺条件为硫酸浓度150 g/L、液固比7∶1、浸出时间3 h、浸出温度90℃,在较优浸出条件下,锌浸出率可达95%以上。 The leaching of zinc dust using sulfuric acid as lixivium was studied. The orthogonal experiments and the mono-factor experiments were made to investigate the influence of concentration of sulfuric acid, liquid-to-solid ratio,leaching time, leaching temperature on zinc, iron acid-leaching performance of the zinc dust. The optimal pro- cessing conditions of leaching as follows the concentration of sulfuric acid is 150 g/L,liquid-to-solid ration is 7: 1, leaching temperature is 90℃,leaching time is 3 h. Under these conditions, the leaching percent of zinc is 95%.
作者 周坐东
出处 《湖南有色金属》 CAS 2012年第3期35-37,共3页 Hunan Nonferrous Metals
关键词 锌烟尘 浸出率 湿法冶金 zinc dust leaching percent hydrometallurgical
  • 相关文献

参考文献10

二级参考文献31

共引文献126

同被引文献33

引证文献3

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部