期刊文献+

深覆盖层上建土石坝研究与实践 被引量:1

Research and Practice about Building Earth-Rock Dams on Deep Overburden Layer
下载PDF
导出
摘要 深覆盖层上建土石坝已成为一种趋势,依据国内外具体的工程实例,总结归纳了深覆盖层上建土石坝存在的主要问题,并就渗漏和渗透稳定问题作了具体的分析.对于混凝土防渗墙防渗形式,应用了Fortran语言编制的饱和土二维渗流分析程序进行了渗流计算,计算结果表明其防渗效果良好. It has been becoming a trend to build earth-rock dams on deep overburden layer. This paper summarizes the main current problems about the construction of earth-rock dams on deep overburden layer through some specific engineering practices at home and abroad; and then it analyzes the stability problems caused by leakage and infiltration in detail. This paper also conducts the seepage calculation for the concrete cutoff wall by using 2-dimensional saturated soil seepage analysis program compiled by Fortran. The seepage calculation results show that the concrete cutoff wall has good anti-seepage effectiveness.
作者 鲁传银
出处 《三峡大学学报(自然科学版)》 CAS 2012年第3期20-24,共5页 Journal of China Three Gorges University:Natural Sciences
基金 "十一五"国家科技支撑计划项目(2008BAB29B02)
关键词 深覆盖层 土石坝 渗漏与渗透稳定 混凝土防渗墙 有限元 deep overberden layer earth-rock dams stability of leakage and infiltration concrete cutoff wall finite elements
  • 相关文献

参考文献8

二级参考文献46

共引文献119

同被引文献18

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部