摘要
深覆盖层上建土石坝已成为一种趋势,依据国内外具体的工程实例,总结归纳了深覆盖层上建土石坝存在的主要问题,并就渗漏和渗透稳定问题作了具体的分析.对于混凝土防渗墙防渗形式,应用了Fortran语言编制的饱和土二维渗流分析程序进行了渗流计算,计算结果表明其防渗效果良好.
It has been becoming a trend to build earth-rock dams on deep overburden layer. This paper summarizes the main current problems about the construction of earth-rock dams on deep overburden layer through some specific engineering practices at home and abroad; and then it analyzes the stability problems caused by leakage and infiltration in detail. This paper also conducts the seepage calculation for the concrete cutoff wall by using 2-dimensional saturated soil seepage analysis program compiled by Fortran. The seepage calculation results show that the concrete cutoff wall has good anti-seepage effectiveness.
出处
《三峡大学学报(自然科学版)》
CAS
2012年第3期20-24,共5页
Journal of China Three Gorges University:Natural Sciences
基金
"十一五"国家科技支撑计划项目(2008BAB29B02)
关键词
深覆盖层
土石坝
渗漏与渗透稳定
混凝土防渗墙
有限元
deep overberden layer
earth-rock dams
stability of leakage and infiltration
concrete cutoff wall
finite elements