摘要 在采石场爆破规模和药量控制范围确定条件下,通过对隧道监测到的测点振速和爆源距,分析了爆破振动对隧道的影响,并给出了爆破振动速度衰减公式。分析了爆破振动速度对新建隧道已建成部分、处于破碎带区域隧道及隧道建设过程中新浇筑混凝土的影响。分析结果表明,采石场爆破振动对隧道建设没有破坏性影响,分析结果为该隧道建设和安全评定提供了科学依据。 Under the situation quarry, the influence of blasting of only knowing the scale and scope of blasting explosive used by the vibration on the tunnel was analyzed by the vibration velocity of measure points monitored and distance between blasting center and measure points. The attenuation equation of the vibration velocity was given. The influences of blasting vibration on the completed part of new tunnel, the tunnel which locates in fracture zone, and new pouring concrete in the process of building tunnel were analyzed. The result shows that tile influence of blasting vibration from the quarry on the construction of the tunnel is not destructive, which provides the scientific basis for construction and safe assessment of the tunnel.
出处 《工程爆破》 北大核心 2012年第2期97-100,共4页 Engineering Blasting
关键词 采石场 爆破振动 隧道安全 安全评定 Quarry Blasting vibration Safety of the tunnel Safe assessment
  • 相关文献

参考文献4

二级参考文献22

共引文献52

同被引文献48

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部