结合凉水冲水库大坝的实际情况,对放水涵管改建方案进行比选,并简要介绍了推荐方案—虹吸式放水涵管的设计。方案实施后,运行效果良好。
Reconstruction schemes of discharge culvert were compared and selected according to the actual situation of main dam of Liangshuichong Reservoir. A brief introduction was made on the design of siphon discharge cul- ver, the determined scheme which had been carried out rendering good effect.
出处
《广西水利水电》
2012年第3期43-45,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
水库
虹吸式
放水涵管
设计
Reservoir
siphon
discharge culvert
design