团结水库大坝在除险加固过程中,曾发生严重的滑坡事故。文章对滑坡原因、除险加固技术方案,以及处理效果作了较全面的分析介绍。
Serious accident of landslide occurred while risks of dam of Tuanjie Reservoir were eliminated and the dam was reinforced. In this paper, landslide reasons, technical scheme for dam risk elimination and reinforcement as well as treatment effects are fully analyzed and introduced.