期刊文献+

隧道掌子面与溶洞安全距离分析 被引量:31

Analysis of the Safe Distance Between a Tunnel Face and Karst Cave
下载PDF
导出
摘要 岩溶地区隧道开挖掌子面前方存在的大型溶洞对施工的威胁非常大,如何确定开挖掌子面前方合理的岩盘安全厚度,并及时进行超前支护或对溶洞进行处理,是岩溶隧道施工中必须解决的一个关键技术问题。文章通过数值模拟和理论计算,对隧道掌子面与溶洞安全距离的影响因素进行了分析研究,建立了预测隧道掌子面前方岩盘安全厚度的计算方法(经验类比法、理论计算法、数值分析法)及计算图式,给出了安全距离计算公式并进行了工程实例分析。 A large cave in front of the tunnel face in a karst area makes for a very large construction risk. It is very important to keep a reasonable laccolith thickness in front of the tunnel face and to use support in advance of the face during the construction of a karst tunnel. This study analyzes the factors affecting the safe distance between a tunnel face and karst cave by means of numerical simulation and theoretical calculation and establishes the calculation methods (empirical, analogue, theoretical calculation, and numerical analysis) plus computation schemes and formulas for predicting a safe thickness of laccolith in front of the tunnel face. Additionally, the analysis of a project case is carried out based on theoretical calculation and numerical simulation.
出处 《现代隧道技术》 EI 北大核心 2012年第3期109-113,共5页 Modern Tunnelling Technology
关键词 隧道掌子面 岩溶 安全距离 Tunnel face Karst Safe distance
  • 相关文献

参考文献6

二级参考文献38

共引文献85

同被引文献235

引证文献31

二级引证文献176

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部