阐述了太原第二热电厂 8号空冷塔改进以后的循环水泵使用性能 ,塔内水量分配及其风速、风温分布状况试验 。
It introduces the performance test of the circulating pump after the improvement done on No 8 dry cooling tower. The assignment of the water flow and the arrangement of various wind speed and wind temperature in the tower are studied. It draws a preliminary conclusion of the improvement.
关键词
空冷塔
循环水泵
水工况
热电厂
dry cooling tower
circulating pump
short circuit window
water condition