摘要
以湘江特大桥小岔河桥的施工合龙方案为依据,从成桥部分受力状态、施工控制预拱度、施工工艺可行性等方面,粗略分析了分步施工与同步施工的不同,为同类桥梁的施工提供了参考。
Based on the construction closure scheme of Xiaochahe Bridge of Xianggjiang Grand Bridge, this paper analyzes the differences between synchronous construction and step-by-step construction from aspects of completed bridge part's stress state, construction controlled pre-camher, and construction technique's feasibility, etc., providing references for the construction of similar bridges.
出处
《科技情报开发与经济》
2012年第11期129-132,共4页
Sci-Tech Information Development & Economy
关键词
桥梁施工
连续梁
同步施工
分步施工
bridge continuous
continuous beam
synchronous construction
step-by-step construction