摘要
受下游西枝江水利枢纽蓄水发电影响,平山水文站水流运动场变得复杂,流量测验与整编工作遇到挑战。文章结合实际工作情况,以水电站发电功率及实际水头计算流量,通过编制多个VBA程序进行计算,生成广东省水文系统水文资料整编程序的专用原始运算文件(Z0G文件),运行"水文资料整编程序"即可输出整编成果表。
PingShan hydrological station water playground become complicated and the work of flow test and reorganize was suffered the challenge in the influence of West ZhiJiang water conservancy hub by downstream water power generation.Based on the working practice,the hydrological data of Guangdong province was generated hydrological system reorganize the special original operation program files(Z0G documents),to operated 'hydrological data reorganized program' can output reorganized results table.
出处
《大众科技》
2012年第6期116-117,72,共3页
Popular Science & Technology
关键词
水电站发电功率
实际水头
(平山站)水电站过水流量计算程序
Hydropower station power generation power
The actual head
(PingShan station) water flow calculation programs of hydropower station