摘要
老厂锡矿14-5#矿体原设计为上向式水平分层胶结充填采矿法,实践中暴露出一系列问题。运用分层空场嗣后块石胶结充填采矿法对采场结构参数进行了优化,解决了存在的问题,获得了较好的效果。
Upward type horizontal sub-level cemented filling mining method has been adopted in 14- 5^﹟ ore body of Laochang tin ore, but a series of problems exposed. Through adoption of layering open stope afterwards cemented rockfill mining method, slope structural parameters were optimized, problems were solved and good economic effects was obtained.
出处
《现代矿业》
CAS
2012年第5期1-3,20,共4页
Modern Mining
关键词
块石胶结充填
贫化率
损失率
充填成本
Cemented rockfill, Dilution rate, Loss rate, Filling cost