摘要
A 1 260 m^3 blast furnace of Xilin Iron and Steel Group was put into production in April 4^th, 2012, and its annual capacity is 1.02 million tons. Phase II proiect of technical process optimization and upgrading of Xilin hon and Steel Group will break earth. The total investment is CNY 800 million.
A 1 260 m^3 blast furnace of Xilin Iron and Steel Group was put into production in April 4^th, 2012, and its annual capacity is 1.02 million tons. Phase II proiect of technical process optimization and upgrading of Xilin hon and Steel Group will break earth. The total investment is CNY 800 million.