5Zheng. J.Y,Wu.A.L. Considerations of technology management for safety hearing to schematic design of timbering system for retaining and protecting for foundation pit excavation in Guangzhou region [J]. Advanced Material Research,2011,261 (3) : 1386-1392. 被引量:1
2Zheng J Y, Wu A L. Considerations of technology management for safety hearing to schematic design of timbering system for re- taining and protecting for foundation pit excavation in Guangzhou region[J]. Advanced Material Research, 2011 (261-263 ) : 1386- 1392. 被引量:1
3Zheng J Y. Considerations on technical and administrative man- agement for peer review of preliminary design of bracing and retaining structure for foundation pit excavation protection in Guangzhou region[C]//Chang S Y, Bahar S K A, Zhao J Y. Ad- vances in Civil Engineering and Building Materials,London: CRC Press, 2013 : 425-428. 被引量:1