浅埋暗挖双联拱大跨隧道下穿既有线综合施工技术 被引量:8

Technology for Construction of Multi-arch Tunnels with Twin Large Spans and Shallow Embedment and Concealed Excavation beneath Existing Railway
下载PDF
导出
摘要 京石客专石家庄六线隧道下穿既有石太直通线暗挖段,采用浅埋暗挖施工技术,应用扣轨加固、动态注浆、超前支护、监控量测等辅助措施采取"中洞法+CRD法"施工,对暗挖大跨隧道实施分部开挖、依次衬砌。在不封锁既有线路的情况下,浅埋暗挖大跨度隧道下穿既有铁路的综合施工技术,具有确保既有线正常运营、施工受制约干扰小、安全高效等优点,为隧道下穿既有线施工提供了有益借鉴。 Beijing—Shijiazhuang Passenger Railway Line 6 at Shijiazhuang concealed excavation section beneth existing railway uses the technology of shallow embedment and concealed excavation,and applies the supporting measures such as reinforcement,dynamic grouting,advance support,monitoring and surveying and combines hole method and CRD method together,implements partial excavation,lining in turn.Under the situation that the existing line runs,the shallow embedment and concealed excavation beneath the existing railway technology can ensure the normal operation of existing line,construction limitation and interference is little,and is safe and efficient,providing useful reference for the construction of tunnel beneath existing line.
作者 郝金印 刘杨
出处 《价值工程》 2012年第14期71-73,共3页 Value Engineering
关键词 浅埋暗挖 大跨隧道 既有线施工 施工技术 shallow embedment and concealed excavation large-span tunnel existing lines construction construction technology
  • 相关文献

参考文献7

  • 1铁道第三勘察设计院集团有限公司.石家庄六线隧道设计文件.天津,2009. 被引量:1
  • 2王梦恕著..地下工程浅埋暗挖技术通论[M].合肥:安徽教育出版社,2004:853.
  • 3余永祯,周世明,林婉华等.建筑施工手册第四版(缩印本)[M].北京:中国建筑工业出版社,2009. 被引量:1
  • 4王梦恕编著..中国隧道与地下工程修建技术[M].北京:人民交通出版社,2010:924.
  • 5王占生,张顶立.浅埋暗挖隧道近距下穿既有地铁的关键技术[J].岩石力学与工程学报,2007,26(S2):4208-4214. 被引量:99
  • 6中华人民共和国铁道部.TZ214-2005.客运专线铁路隧道工程施工技术指南.北京:中国铁道出版社,2005. 被引量:1
  • 7中华人民共和国铁道部.铁建设【2005】160号.客运专线铁路隧道工程质量验收暂行标准[S].北京:中国铁道出版社,2005. 被引量:1

二级参考文献10

  • 1王梦恕.地下工程浅埋暗挖技术通论[M]安徽教育出版社,2005. 被引量:9
  • 2KASSAP B P,GOYAL B B.Redline underpinning—lessons learned[].North American Tunnelling′.2000 被引量:1
  • 3CHANG S B,MOON S J.A case study on instrumentations of a largetunnel crossing under the exiting subway structure[].Proceeding of the KGSSpring Conference.2000 被引量:1
  • 4LUNARDI P,CASSANI G.Construction of an underpass at the Ravone railway yard in the city of Bologna:aspects of the design and construction[].Progress in Tunneling after(III).2001 被引量:1
  • 5SHARMA J S,HEFNY A M,ZHAO J,et al.Effect of large excavation on deformation of adjacent MRT tunnels[].Tunnelling and Underground Space Technology.2001 被引量:1
  • 6BURLAND J B,STANDING J R,JARDINE F M.Building response to tunnelling,case studies from construction of the Jubilee Line Extension[].Project and Methods.2001 被引量:1
  • 7BRENNER B,NEFF T.Design and management for underground uncertainty on the central artery/tunnel project[].North American Tunnelling′.2000 被引量:1
  • 8GRYNKEWICZ F,ROBERT B.Instrumentation controls for chemical grouting during tunneling operation[].North American Tunnelling′.2000 被引量:1
  • 9ATTEWELL P B,YEATES J,SELBY A R.Soil movements induced by tunneling and their effects on pilelines and structures[]..1986 被引量:1
  • 10MAIR R J,TAYLOR R N,BRACEGIRDLE A.Subsurface settlement profiles above tunnels in clay[].Geotechnique. 被引量:1

共引文献98

同被引文献19

引证文献8

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部