1000MW超超临界机组汽轮机启动和试运问题分析 被引量:2

Analysis of Problems in Starting-up and Commissioning Process of 1000 MW Ultra-supercritical Steam Turbine
原文传递
导出
摘要 结合某电厂机组启动、试运实例,介绍引进西门子技术制造的1000MW超超临界机组汽轮机结构特点和启动过程控制技术;在分析启动、试运过程中出现问题的基础上,提出1000MW超超临界机组调试及锅炉蒸汽吹管的优化建议,为同类机组试运、调试提供参考。 Base on the unit's starting-up and commissioning process in a power plant, this paper introduced the structure characteristics and starting-up process's control technologies of 1 000 MW steam turbine with SIEMENS technology. Problems in starting-up and commissioning process were analyzed, and some proposal were put forward for the commissioning of 1 000 MW ultra-supercritical unit and the optimization of boiler steam-blowing, which could provide references for other units' commissioning.
出处 《电力建设》 2012年第5期93-96,共4页 Electric Power Construction
关键词 超超临界机组 汽轮机 机组调试 锅炉蒸汽吹管 ultra-supercritical unit steam turbine unit commissioning boiler steam-blowing
  • 相关文献

参考文献11

二级参考文献17

共引文献95

同被引文献14

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部