摘要
浙江省东阳市筛米塘整治工程采用冲抓式套井回填的方法更换原大坝心墙。结果表明:更换后的心墙防渗效果好,达到了整治加固目的。
Foe the Shaimi Pond harnessing Project located in Dongyang City of Zhejiang Province,the original core wall was replaced by percussive grabbing sleeve backfill method,attaining the harnessing and reinforcement purpose with good anti-seepage effect.
出处
《广西水利水电》
2012年第2期71-71,76,共2页
Guangxi Water Resources & Hydropower Engineering
关键词
冲抓式
套井回填
心墙
加固
防渗
Percussive grabbing
sleeve backfill
core wall
reinforcement
anti-seepage