摘要
阳城电厂7#机组空冷塔采用海勒间接空冷技术,叙述了其工艺系统、间接空冷塔安装、机械配备、施工过程管理、系统严密性试验以及质量保证措施。
Heller indirect air-cooling technology is used in cooling Tower of 7 # Unit in Yangcheng power plant. Described its process system, and indirect air cooling tower installation, machinery equipment, construction process management, system tightness test and quality assurance measure.
出处
《能源与节能》
2012年第3期86-88,共3页
Energy and Energy Conservation
关键词
间接空冷
富煤缺水
汽轮机排汽
空冷散热器
节水环保
安装
indirect air-cooling
rich in coal but lack of water
turbine discharge
air-cooling radiator, water-saving and environmental protection
installation